The Rigging Shed was contacted by a client requiring an urgent solution to lift & remove the old crusher mainframe for an upcoming shut down onsite. These were extremely urgent and we had a very short lead time to work with. The Rigging Shed worked closely with a manufacturer and their engineering team to come up with a design that would suit the customers requirements.
The items were manufactured & air freighted from Luxembourg ahead of schedule. The lift was conducted successfully and safely on the day as planned resulting in a very happy customer.
“These items were required due to the current M100 threads being corroded and un-serviceable for lifting, they worked seamlessly as per the attached photos.
The team at The Rigging Shed worked overtime and provided the best product possible for the job within the short time frames they were given.
Without The Rigging Shed team sourcing this product we would not have been able to achieve our deadlines and plan to remove the old crusher mainframe without any guess work”